Request a Proposal
Don’t worry if you don’t have all of the information specified as our technical team will be happy to guide you through the process of getting your systems certified and maintained.
In accordance with BS 7346 Part 8 Components for smoke control systems Part 8: Code of practice for planning, design, installation, commissioning, and maintenance we recommend that a special inspection is undertaken to enable us to certify your smoke control systems as compliant with the building regulations.
This will entail referencing any records, including the system design performance requirements, in order to produce a plan for effective maintenance of the system. if no suitable records exist, a system design performance requirement will be agreed or developed. Once the performance requirements have been established, the physical performance of the system will be checked, e.g. fan flow rates.
Don’t worry if you don’t have all of the information specified as our technical team will be happy to guide you through the process of getting your systems certified and maintained.