Slit Actuator – 500N, 24V, 1.1A, 485MM Stroke EA-L/S

£285.50 / £342.60 incl. VAT

Electromechanical slit actuator, type EA-L/S-500/500-02

Tested to DIN EN 12101-2. Voltage 24 V DC, rated current 1.2 A, nominal force 500 N, IP 20, switch-on duration 30%, running speed at nominal load 8.4 mm / s, integrated electronic overload cut-off and potential advance "F", as well as built-in position-independent stop damping, in continuous aluminum Profile tube, housing anodized E6 / EV1, with cable entry on the motor housing cover, incl. 2.0 m silicone connection cable SIHF 3 x 0.75 mm², light gray, integrated housing for flexible bracket system in the motor housing. Overall length of motor housing: Stroke + 284 mm + 20 mm (cable insert), Stroke 485 mm, incl. Rear bearing, Type HK-L and setting angle, Type AW-80-S.

Frequently Bought Together

Slit Actuator + EV-301Smoke Ventilation AOV Control Pane Control Panel + EV-HE077 Firemans Override Switch
Price for all three: £737.50

In conjunction with a glass louvre TG-24 (RWA), the slit actuator type EA-L/S-500-02, which has been specially modified for louvre windows, is the optimum solution in the SHE area and as a supply air system. Even with small stroke lengths, large opening widths can be achieved.

More safety through integrated overload cut-off

In addition to the torque control by monitoring the current consumption to the force curve, the integrated electronics also take over the automatic switch-off under load. The slit actuator is also suitable for use with turning and swinging wings after a technical test. A combination with a ZVE-UNI-I / A type auxiliary electrical lock is recommended for adequate window locking.

Your benefits at a glance:

  • unique opening kinematics via deployment angle
  • 60° opening within the soffit - also possible over 140° opening
  • for inward and outward opening bottom hung wings and rotary wings
  • integrated electronic overload cut-off
  • integrated safety shutdown
  • can be combined with additional electrical locking ZVE-UNI-I / A

Under the Construction Products Regulations (CPR) it is a legal requirement to use only certified products for smoke ventilation. It is the responsibility of the installer to ensure installations meet the relevant standards. For more information see SCS Group’s Technical Bulletin.

Resize Font
Contrast Mode
0
    0
    Your Basket
    Your basket is emptyReturn to Shop