The EV-IOD interface panel has 8 digital inputs and 6 relay outputs with expansion options for receipt of signals from third party systems.
This UKCA & CE Marked to Low voltage and EMC Regulations & Directives connects to the master panel as an addressable device on the EV-100 data network or directly by Ethernet.
Under the Construction Products Regulations (CPR) it is a legal requirement to use only certified products for smoke ventilation. It is the responsibility of the installer to ensure installations meet the relevant standards. For more information see SCS Group’s Technical Bulletin.