Project Background
Riverside House, Bristol, is an apartment building located in the centre of the city. SCS Group’s service department, SCS Support, was called to attend the building in June 2016 to look at the building’s existing mechanical smoke ventilation system.
Photo © Tecra Global
The Project
The system before SCS Group’s involvement:
SCS Group’s Solution
Using its turnkey small work’s solution, SCS Support upgraded Riverside House’s system from top to bottom.
We installed the latest FläktWoods high temperature smoke extract fans as well as Easivent smoke shaft doors, actuators and control system. A maintained supply was ensured via a new UPS system.
SCS Support completed the upgrade of the mechanical smoke ventilation system on budget and within one month, meeting the customer’s exact requirements for building sign-off.
Upgraded Riverside House’s system from top to bottom
FläktWoods high temperature smoke extract fans
SCS Group smoke shaft doors, actuators and control system
A maintained supply was ensured via a new UPS system