MENU ICON

Why choose SCS Group for your BEMS project?

After we’ve designed, manufactured and delivered the panel, our BEMS engineers will then prepare, write and upload the software on site before commissioning

After we’ve designed, manufactured and delivered the panel, our BEMS engineers will then prepare, write and upload the software on site before commissioning

IF YOU are looking for a new Building Energy Management System (BEMS) then SCS Group can offer an approach focused on saving energy and saving money with the high quality that you’d expect from our company.

BEMS or BMS (Building Management System) are designed to integrate various environmental controls such as heating, lighting, ventilation and security through one system and our experienced BEMS engineers can ensure this is what you get.

Our manufacturing department can create a BEMS panel design from a client’s points list and then manufacture it within a very short lead time. Normally, completion is between four and six weeks from receipt of the points list to delivery to site.

Extensive designs

As well as offering an extensive library of various designs, we can also offer Factory Acceptance Testing (FAT) for clients.

Simon Inwood, Director, who is based at SCS Group’s manufacturing department in Dorset, said: “After we’ve designed, manufactured and delivered the panel, our BEMS engineers will then prepare, write and upload the software on site before commissioning.

“This is normally carried out by the same engineer which allows for a smooth transition from commissioning to handover.”

An SCS Group BEMS panel which was installed recently on a site

An SCS Group BEMS panel which was installed recently on a site

SCS Group has completed an array of impressive BEMS/BMS projects including in schools, shops and residential developments. We are also currently working on a BMS system at Severnside waste transfer system, which we are integrating with dampers and smoke.

Integrated BMS system

Additionally, we’ve completed an innovative integration system at an ExtraCare retirement village, Bournville Gardens, which combined BMS, natural ventilation and smoke control in a single system.

Nick Sheriff, Area Maintenance and Facilities Manager at Bournville Gardens, who operates all types of systems installed in ExtraCare’s retirement villages, said: “The system is very easy to use via the BMS front end interface.”

SCS Group is entirely independent, with its staff able to turn their hands to whatever equipment the customer wants (including Priva, Trend and Schneider) without pushing in one director or the other for our own reasons.

Read about our BEMS and BMS projects

If you would like any further information, email info@groupscs.co.uk or call 0870 240 6460. Follow the links below to see case studies on just some of our BEMS/BMS projects:

University of Sussex

Williamstown Primary School, Rhondda Cynon Taff

Abercynon Community Primary School

Treorchy Primary School

Bournville Gardens Retirement Village

60 Commercial Road, London (student accommodation)

Limehouse Basin

Greenwich Peninsula

Caspian Wharf, Bow

King’s Cross office development

61 Oxford Street

Lyric Theatre