MENU ICON

Crossharbour, Canary Wharf, London

crossharbour-canary-wharf-london

SCS Group’s Solution SCS Group was chosen to run the contract to supply and install control systems and provide a value engineered solution for Crossharbour. A combination of co-compliant natural and mechanical ventilation systems were supplied and installed by the … Continue reading

Williamstown Primary School, RCT

williamstown-school01

SCS Group’s Solution SCS Group integrated the natural ventilation in the heart of the building onto the BEMS system which reduced the costs of the installation and increased the functionality and monitoring of the ventilation. SCS also installed an EnDat … Continue reading

Greenwich Peninsula

greenwich-peninsula

SCS Group’s Solution SCS Group designed and installed three mechanical smoke ventilation systems to two blocks and a natural ventilation system to a third. On all cores we incorporated a daily ventilation mode to the equipment to maintain comfortable temperatures … Continue reading

London 2012 Olympic Velodrome

london-olympic-veledrome-2012

SCS Group’s Solution Although not the specified methodology, SCS Group suggested installing 4 vents into each 6 m x 3 m wall panel at the production facility. This saved both installation time and reduced the number of contractors required on … Continue reading

University of Sussex

fulton-building

SCS Group’s Solution Automatic dampers control ventilation rates in the lecture rooms, 100 automatic actuators installed in high-level windows provide fresh air ventilation to the common areas and atrium. SCS Group also provided a large smoke control vent above the … Continue reading